28 Apr 2012

Jawaharlal Nehru National Solar Mission


The first phase of the Jawaharlal Nehru National Solar Mission (JNNSM) is scheduled to be completed by 2013 only. However, as per progress available so far all the application segments of the Mission are going on as scheduled and on target.

             The details of projects sanctioned under the Phase-I of the JNNSM are as under:
i)          Projects under Migration Scheme (84 MW-Solar PV - 54MW, Solar Thermal – 30 MW)
ii)         Projects under New Project Scheme (Batch-I) (Solar PV- 150 MW, Solar Thermal- 470 MW):
iii)        Projects under New Projects Scheme (Batch-II) (Solar PV- 350 MW)
iv)        Projects under Roof top PV and Small Solar Power Generation Programme (RPSSGP) – 98.05 MW

             The details of the projects are given below:-

a)    Projects under Migration Scheme (84 MW – Solar PV-54 MW, Solar Thermal-30 MW)
State
Projects under Migration Scheme
Solar PV (MW)
Solar Thermal (MW)
Total (MW)
Rajasthan
36
30
66
Maharashtra
11

11
Punjab
7

7
Total
54
30
84


b)   Projects under Batch-I, Phase-I (Solar PV-150 MW, Solar Thermal-470 MW)
State wise details of Selected Capacity is as under:
State
New Projects
Solar PV (MW)
Solar Thermal (MW)
Total (MW)
Rajasthan
105
400
505
Maharashtra
5

5
Andhra Pradesh
15
50
65
Karnataka
10

10
Gujarat

20
20
Orissa
5

5
Tamil Nadu
5

5
Uttar Pradesh
5

5
Total
150
470
620

Out of the above, PPA’s were signed with 36 Solar Power Developers for 145 MW Solar PV and 470 MW of Solar Thermal by 10th January, 2011.

c)    Projects under Batch-II, Phase-I (Solar PV-350 MW)

State
Project Capacity (MW) /
No. of Projects
Solar PV (MW)
5
10
15
20
Total
Rajasthan
5
9
4
6
24
295
Maharashtra
1


1
2
25
Andhra Pradesh



1
1
20
Tamil Nadu

1


1
10
Total
6
10
4
8
28
350

Out of the above, PPA’s were signed with 21 selected bidders for 27 Solar Power projects (340 MW) by 27th January, 2012.

d)   Projects under Roof top PV and Small Solar Power Generation Programme (RPSSGP) – 98.05 MW

S. no
State
Sanctioned  Project Capacity  (MW)
1
Andhra Pradesh
10.5
2
Chhattisgarh
4
3
Haryana
8.8
4
Maharashtra
5
5
Orissa
8
6
Punjab
8.5
7
Rajasthan
12
8
Tamil Nadu
7
9
Uttrakhand
5
10
Uttar Pradesh
8
11
Jharkhand
16
12
Madhya Pradesh
5.25
Total
98.05

No project is pending for approval with the Ministry.

             The details of the projects completed, commissioned and synchronized with the grid, State-wise are provided below:-

a)    Migration Projects: Commissioning Status of the Solar PV Projects (as per reports received from State Nodal Agencies)
State
Solar PV capacity to be commissioned as per PPA
(MW)
Solar PV capacity actually commissioned
(MW)
Rajasthan
36
35
Maharashtra
11
 9
Punjab
7
 2
Total
54
46

Solar Thermal Projects (30 MW) to be commissioned in 28 months from the date of signing of PPA (i.e. up to mid February, 2013)

b)   Projects under Batch-I, Phase-I - Commissioning Status of the Solar PV Projects (as per reports received from State Nodal Agencies)

State
Solar PV capacity to be commissioned as per PPA (MW)
Solar PV capacity actually commissioned
(MW)
Rajasthan
100
100
Maharashtra
5
-
Andhra Pradesh
15
10
Karnataka
5
-
Orissa
5
5
Tamil Nadu
5
5
Uttar Pradesh
5
5
Total
140
125

Solar Thermal Projects (470 MW) scheduled to be commissioned in 28 months from the date of signing of PPA (i.e. up to mid May, 2013).



c)    Projects under Batch-II, Phase-I
Solar PV Projects (340 MW) scheduled to be commissioned in 13 months from the date of signing of PPA (i.e. Feb, 2013)


d)   Rooftop PV and Small Solar Power Generation Programme (RPSSGP)


State Wise:

S. No.
State
Solar PV
Solar PV



capacity to be
capacity



commissioned
actually



as per PPA
commissioned



(MW)
(MW)*






1
Andhra Pradesh
10.5
7.75

2
Chhattisgarh
4
4

3
Haryana
8.8
7.8

4
Maharashtra
5
5

5
Orissa
8
5

6
Punjab
8.5
5.5

7
Rajasthan
12
8

8
Tamil Nadu
7
5

9
Uttrakhand
5
3

10
Uttar Pradesh
8
5

11
Jharkhand
16
2






12
Madhya
5.25
0

Pradesh


Total
98.05
58.05






*Out of total 78 sanctioned Projects 11 Projects are to be commissioned by June, 2012.
           
The guidelines that deal with the import of solar modules for Phase-I are specified as under:
Batch-I: For Solar PV Projects, it is mandatory for Projects based on crystalline silicon technology to use the modules manufactured in India.
Batch-II: For Solar PV Projects to be selected in second batch, it will be mandatory for all the projects to use cells and modules manufactured in India. PV Modules made from thin film technologies or concentrator PV cells may be sourced from any country, provided the technical qualification criterion is fully met.

All the Developers using Crystalline Silicon technology have confirmed compliance of domestic content clause.

            Following allegations in a section of the media about violation of guidelines by some companies, the Ministry has set up an inquiry committee. The committee comprises representatives from the Ministries of New & Renewable Energy, Power and Corporate Affairs.

            The inquiry committee is yet to submit its final report.

This information was given by the Minister of New and Renewable Energy Dr. Farooq Abdullah in a written reply to a question in Lok Sabha today.